Driveway Installed and Cleared Brush from Parking Area
The contractor finished installing the driveway on 03/16/2022 and we began clearing the land for the parking area on 03/19/2022 (4 hours). The work is being done by ourselves with just hand tools. The brush is being cut up in small pieces and being used for a wood chip parking area. On 04/23/2022 (4 hours), we cut up with shears and cleaned up vinyl siding that appeared to be from an old house on the property that is no longer there. We moved just about all of the dirt on 05/14/2022 (4 hours) from the pile on the left to the hole where the foundation used to be. This was done with just a mattock and a couple of shovels and 5-gallon buckets. We finished moving the dirt on 06/11/2022 (4 hours) from the pile on the left to the hole where the foundation used to be. Started clearing the brush around the removed dirt pile with hand tools. From 07/09/2022 through 07/15/2022 (8 hours each day) we moved all of the dirt from the pile on the right to the hole where the foundation used to be. We c...