MAKA Minigolf is a new miniature golf course being built in Ashtabula County, Ohio. After searching for the perfect location, we placed an offer on a vacant wooded lot on 11/08/2021. The offer was accepted, and the official date of sale was 12/15/2021. The first phase of the miniature golf course construction involved working with the Ohio Department of Transportation to establish the best location for a field driveway and to acquire the necessary permits. We met with the department of transportation on 01/05/2022 and a driveway permit was issued on 01/18/2022. Once the necessary permits were obtained an excavation company was hired to install a culvert and gravel driveway. We started clearing the brush by hand for the driveway on 02/20/2022. The contractor finished installing the driveway on 03/16/2022.This allowed access to the property. The second phase of the miniature golf course construction was to clear the land for the parking area. The planned parking area was 65 feet deep by ...

Added Patio Area

Image
We cut down a half fallen dead tree on 01/18/2025 (3.5 hours). In addition, we cut up some dead trees that were on the ground and used them for edging. On 02/17/2025 (1.5 hours) we heard a tree making a cracking noise in the wind and snow. Upon looking closer at the tree, we discovered a big crack in its trunk. It looked like it could fall at any time. Since we were working close to the tree, we decided to cut it down. It was the largest tree that we cut down that day.  We also cut down 2 smaller trees and cut up another tree that had previously fallen and was on the ground. The roads were snow covered which increased our travel time and so we had less time to work on the course. We cut up 3 trees on the ground on 03/22/2025 (4 hours) and added them to the log edging. We also cut down 2 dead trees. We cut down a leaning tree with the two-man saw on 04/26/2025 (4 hours). When the tree fell it knocked down another dead tree. In addition, we cut down 3 more dead trees for a total of 5...

Finished Clearing Brush for Course

Image
We cut down about a half dozen small, less than 6 inches in diameter, trees on 01/21/2024 (4 hours) in the parking area on the right. We then stacked the logs from the cut trees to form a border to the parking area on the right. We also cleared brush along the creek. All of the work was done using a machete, loppers, and hedge shears. On 02/18/2024 (6 hours) we removed brush from a small island. This island will most likely become the main focal point of the miniature golf course. We also cleared brush along the creek. All of the work was done using a machete and loppers. We cleared brush on 03/09/2024 (5 hours) on the left side of the creek by hand using loppers and a machete. There are some small trees that seem to be fairly healthy that we would like to keep and design the course around. We cleared the brush on the left side of the property by hand using loppers and a machete on 03/17/2024 (6 hours). Most of the course has now been cleared of brush. There are still some larger d...

Installed a Couple of Mulch Parking Spaces

Image
On 01/15/2023 (4 hours), we finished removing the last branch from a maple tree close to the road using a rope chain saw. We also started removing several trees that were too close to the road. We would like to thank the Ohio Department of Transportation for cutting down some trees, prior to our arrival on 02/12/2023 (4 hours), that appeared to be dead or dying and were close to the road. We then cut the trees into smaller sections that could be moved out of the way. We also started to create an edging for the parking area using the cut logs. We prepared part of the lot close to the road for planting on 03/25/2023 (4 hours) by removing existing vegetation exposing the soil. We then spread white Dutch clover seeds on the area that was prepared. White Dutch clover was selected so as to minimize the amount of mowing that will be required in this area. On 04/22/2023 (4 hours), we planted corn and switchgrass on half of the front left side of the parking area. In addition, we planted 4 Norw...

Driveway Installed and Cleared Brush from Parking Area

Image
The contractor finished installing the driveway on 03/16/2022 and we began clearing the land for the parking area on 03/19/2022 (4 hours). The work is being done by ourselves with just hand tools. The brush is being cut up in small pieces and being used for a wood chip parking area. On 04/23/2022 (4 hours), we cut up with shears and cleaned up vinyl siding that appeared to be from an old house on the property that is no longer there. We moved just about all of the dirt on 05/14/2022 (4 hours) from the pile on the left to the hole where the foundation used to be. This was done with just a mattock and a couple of shovels and 5-gallon buckets. We finished moving the dirt on 06/11/2022 (4 hours) from the pile on the left to the hole where the foundation used to be. Started clearing the brush around the removed dirt pile with hand tools. From 07/09/2022 through 07/15/2022 (8 hours each day) we moved all of the dirt from the pile on the right to the hole where the foundation used to be. We c...

Selecting the Site for a New Miniature Golf Course

Image
After looking at numerous potential sites for a new miniature golf course in the late summer and fall of 2021, we went back to take a second look at a property in Andover Twp, OH on 11/06/2021. Out of the sites that we visited, this one had what we were looking for and so we made an offer on 11/08/2021. There were several reasons why we selected this particular site. It was located on a major road not far from a state park. Pymatuning Lake State Park is a large recreational area located on the border of northwestern Pennsylvania and northeastern Ohio, containing one of the largest lakes in Pennsylvania at 17,088 acres. It is one of the most visited state parks in Pennsylvania attracting approximately 3.7 million visitors annually. The site is also relatively flat and has a nice creek that runs through it. There is plenty of room for parking along with the course itself. On 11/27/2021, we took measurements for where to locate the driveway. In December, our offer was accepted, and th...